A ground breaking ceremony was held recently for the proposed spur road project connecting to Long Wat, Apoh under the Highland Development Agency (HDA) in the Telang Usan District.
The ceremony, held in Long Wat, was officiated by Baram MP Anyi Ngau, with the presence of Telang Usan assemblyman Dennis Ngau. The project includes spur roads to Long Wat, Long Tujang, and Long Buang with a length of 23km. Construction is expected to be completed by September 2022.